Noteworthy Projects

CONVENTION CENTERS

  • Colorado Convention Center, Denver, CO
    Erection Engineering, Crawler Crane Support System on Convention Center Roof

  • Moscone Center Expansion, San Francisco, CA
    Erection Engineering, Crawler Crane support structures, Temporary Framing

STADIUMS

  • SOFi Stadium LA, CA
    Erection Engineering, Heavy Lifts, Sequencing, Temporary Framing, stabilization; Bowl and Roof

  • New 49er Stadium, Santa Clara, CA
    Erection Procedures, Temporary Framing

  • California Memorial Stadium
    Engineering the erection and stabilization for the Press Box Trusses

  • Los Angeles Football Club Stadium

ARENAS

  • Chase Arena (Warriors) San Francisco, CA
    Erection Engineering, Truss lifts and stabilization, and Temporary Framing

  • Las Vegas Arena, Las Vegas, NV
    Erection Engineering, Temporary Framing

SPECIAL COMPLEX ARCHITECTURAL STRUCTURES

  • Facebook Menlo Park, CA
    Erection Engineering, Temporary Framing

  • SF Museum of Modern Art
    Erection Engineering

  • Samsung Headquarters, Santa Clara, CA
    Erection Engineering, Temporary columns

  • Cal Poly Pomona, CA
    Erection Engineering, Temporary Framing, Erection Procedures

  • Hakkassan Restaurant at MGM, Las Vegas, NV
    Erection Procedures, and Temporary framing schemes

  • New San Diego Library, CA
    Dome Erection Engineering

  • Walt Disney Concert Hall, Los Angeles, CA
    Erection Engineering | Development of Erector’s schemes: Erection Engineering analysis and recommendations with preparation of formal erection plan/sequence for use by erector and for submittal to construction management group on this challenging Frank Gehry Landmark structure.=

  • Sony Metreon, San Francisco, CA
    Erection Engineering and Connection Design

  • (W)rapper, Culver City, CA

  • Google Charleston East Canopy, Mountain View, CA

  • Google Gibraltar, Sunnyvale, CA

  • Nvidia Phase II, Santa Clara, CA

HIGH RISES

  • 111 South Main, Salt Lake City, Utah
    Erection Engineering, Temporary Framing, 25-story hanging structure

  • Wilshire and Grand Tower, Los Angeles, CA
    Erection Engineering, Temporary Framing

  • Los Angeles Federal Building, Los Angeles, CA
    Erection Engineering

  • Torre Reforma, Mexico City
    Connection design for this 56 Story Tower

  • Freedom Tower, New York City, NY
    Connection design, Transfer Floors 2-20

  • Enron Building 2, Houston Texas
    Connection Design

  • 450 N. Brand building, Glendale, CA
    Connection Design

  • Cal-EPA building, Sacramento, CA
    Connection Design

  • Torre Mayor, Mexico City
    Erection Engineering and Connection Design. Designed climbing crane stabilization system and Derrick support system to take down tower cranes from top of the buildings. Designed all gravity and seismic connections. This 55-story tower utilized viscous dampers in the braced frame system.

  • Campus at Horton Plaza, San Diego, CA
    Buildings A and B retrofit and expansion

TRANSIT CENTERS

  • Transbay Transit Center, San Francisco, CA
    Erection Engineering, Temporary Framing

HANGARS, LONG-SPAN TRUSS STRUCTURES

  • Boeing 40-58 building Everett, WA
    Erection Engineering, Erection of long-span heavy trusses, Temporary Framing

  • Boeing 45-012 building Everett, WA
    Static Test Facility Long Span Truss Erection

  • Micron Building 51 R&D Building Expansion, Boise, ID

  • United Hangar, Los Angeles International Airport, Los Angeles CA

HOSPITALS

  • New Stanford Hospital, Palo Alto, CA
    Erection Engineering, Temporary columns

  • Highland Hospital, Oakland, CA
    Erection Engineering, Temporary Lateral Bracing

INDUSTRIAL

  • El Segundo Power Plant, CA
    Connection Design

  • Imperial Irrigation District Power Plant, El Centro, CA
    Connection Design

  • Calpine Energy Facility, San Jose, CA
    Connection Design

  • Tesla Gigafactory

AIRPORTS

  • Los Angeles International Airport, CA
    Erection Engineering

  • Los Angeles International Airport, CA
    Midfield concourse and gateway Expansion 2017

  • San Francisco International Airport, CA
    Airport Expansion blast resistant Connection design for entire level above roadways

  • San Francisco International Airport, CA
    Expansion Erection Engineering for Landmark Truss Roof system. | Development of Steel Erector’s schemes: Engineering of jacking tower system for lift of multiple truss assembly. Preparation of formal erection plan/sequence for use by erector and for submittal to construction management group.

  • Salt Lake City Airport, Salt Lake City, UT
    Expansion 2017

BRIDGES

  • San Francisco Bay Bridge, CA
    Shop Detail Drawings Review and Approval for Steel Orthotropic Box Girders

  • Federal Courthouse Pedestrian Bridge, San Diego, CA

  • Stanford Hospital Pedestrian Bridge, Palo Alto, CA

  • Uber Headquarters Walkway Bridges, San Francisco, CA